Huntington Park, CA
The tile is fine. The roof might not be.
The most common tile job is not a replacement at all. It is a lift-and-relay: the same tile comes off, new underlayment goes down, the tile goes back.
Describe the tile and slate job
Three questions, then the address. Up to three Huntington Park contractors who do this work.
You are on the list.
No provider in Huntington Park is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a tile and slate job. A contractor who has not raised them has not looked properly.
- Whether battens are being replaced at the same time
- Whether the tile can be salvaged and relaid
- Fastener specification, especially near salt air
- What percentage of tile breakage they expect and how it is priced
- The condition and age of the underlayment beneath
Matching discontinued tile is the real constraint. Salvaging what is there is usually cheaper and always closer.
Broken or slipped tiles are a maintenance item, not an emergency, provided the underlayment beneath is still sound.
Ask specifically how many tile or slate roofs the crew completed last year. The honest number is often small.
Locally
Close behind that: the marine layer keeping the north slope damp. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.
About tile and slate here
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Should I take the cheapest quote?
Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.
Do I need a permit?
Yes, in nearly every jurisdiction a re-roof is permitted work. A contractor who suggests skipping it is telling you something useful about how they work.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
Ready for a real number?
No cost. We email you once when a provider near you can take it on.
